高鐵"和諧號" - 語音播報+LED滾動屏

HK$0



High-speed rail "Harmony" was once the most technologically advanced EMU train in mainland China. In 2004, China introduced high-speed EMU technology from Germany, Japan and other countries, and based on digestion, absorption and innovation, it produced the "Harmony" series of high-speed EMUs. The driver can control the train through a computer. All driving data are displayed electronically instead of traditional instrument displays. Most trains use decentralized power and run at speeds of more than 200 kilometers per hour and up to 350 kilometers per hour. "Harmony" has access to most provincial capitals and cities, including the Hong Kong Special Administrative Region.



Voice broadcast + LED scrolling screen
Media location: LED scrolling screen, voice broadcast
Media material: LED rolling screen (screen above the carriage door)
Media quantity: subject to specific car model
 
 
 
Description:
1. The shortest advertising period is 90 days. Any advertising period less than 90 days must be calculated based on the 90-day media release price and then add 20% of the media release fee and pay for the media production separately. fee;
2. The brands submitted for voice broadcast and LED scrolling screen must conform to the image of high-speed rail;
3. Voice broadcast: within 8 characters (Chinese, English and numbers). Some road bureaus do not agree to publish it in English. No modifiers are allowed; LED scroll screen: within 8 characters, 10 characters for some roads (punctuation marks are not guaranteed to be displayed normally due to vehicle types). The details are subject to the relevant approval regulations of different railway bureaus;
4. The price includes one-time production fee. If the customer needs to make a replacement during the advertising cycle, the production fee will be charged separately;
5. The price of advertising package is based on one group. A group of meanings includes 8 carriages, each carriage has 500-600 seats ;
6.  Advertising packages will be divided into different package prices based on the passenger flow of the train route. The number of passengers is not only calculated based on seats, but also includes the flow of people boarding and alighting at each stop (i.e., the passenger change rate). Therefore, the actual number of exposed people will vary according to the conditions of the route.
 
*For more details/customized plans, Click to see the price table

Enquire for this product

Where did you find us?